Service
Analog
JOBO
ATL-500
and
ATL-800
ATL-1000
and ATL-1500
ATL-2x00
series
ColorLine
100
ColorLine
5000
ColorLine
5100
Comparator
100
ComTime
Conversion
Tables (Metric and English Measures)
CPE-2
Plus
CPA-2
and CPP-2
CPA-2
and CPP-2 Lift
ET-200
Enlarger Timer
Expert
Drums
Installing
#4167 AutoLab Water Heater Kit
Installing
Cogs or Magnets
Loading the
#3027 and #3028 Sheet-Film Drums
Loading
Tanks,
Reels and Drums
PrintLab
3502
PrintLab
3503
PrintLab
3503R
PrintLab
3504
ProTime
100
Specific
Processes
Tank and Drum Capacities
Troubleshooting
-
Fujimoto
-
Fujimoto CP51
Fujimoto
CP51/P-30 (for Ilfochrome P-30)
Tetenal
Ultrafin
Liquid Developer
Times
Ultrafin Plus Developer Times
Mono
C-41
Developing Kit
Mono
PK
RA-4 Developing Kit
E-6
Three Bath Developing Kit
Instructions
for Tetenal Professional PK RA-4
C-41
Press kit
RA-4 10 Liter kit
instructons
Tetenal Storage and Date
codes
|
# |
Bulletin
Title |
Related
Bulletins |
![[Bullet]](images/bullet.gif) |
T001 |
XTOL
Development
in a Rotary Processing |
|
![[Bullet]](images/bullet.gif) |
T002 |
Kodak
EIR
Infrared Transparency Film |
|
![[Bullet]](images/bullet.gif) |
B001 |
How
to Package your Processor Before Shipping |
|
![[Bullet]](images/bullet.gif) |
B002 |
How
to Replace your Pump Motor |
5A,5B,6,7,8 & 9 |
![[Bullet]](images/bullet.gif) |
B003 |
Replacing White Retaining Clips on the
JoboLift |
|
![[Bullet]](images/bullet.gif) |
B004 |
Replacing Transfer Gears on Lift Arm == (in
JOBO
Lifts and AutoLab lift arms that have the four white
clips |
|
![[Bullet]](images/bullet.gif) |
B005A |
Removal the Upper head From an ATL-1,2,2+ or
3 |
|
![[Bullet]](images/bullet.gif) |
B005B |
Removal the Upper head From an ATL-
2000,3000,2200,2300,2400 and 2500 |
|
![[Bullet]](images/bullet.gif) |
B006 |
Removal of the ATL-3, 3000 Lower Motor
Unit |
5A (ATL-3)
5B (ATL 3000) |
![[Bullet]](images/bullet.gif) |
B007A |
Removal of the ATL-2+, 2000 Lower Motor
Unit |
5A (ATL 2+)
5B (ATL 2000) |
![[Bullet]](images/bullet.gif) |
B007B |
Removal
of the ATL
2X00's Lower Motor Unit |
5B
|
![[Bullet]](images/bullet.gif) |
B008 |
Removal of the ATL-1 or ATL-2 Lower Motor
Unit |
5A |
![[Bullet]](images/bullet.gif) |
B009 |
Removal of the CPA-2 or CPP-2 Motor
Unit |
|
![[Bullet]](images/bullet.gif) |
B010A |
Autolab
Electronics
Head Removal For ATL-1 |
|
![[Bullet]](images/bullet.gif) |
B010B |
Autolab
Electronics
Head Removal For ATL-2
And 2 PLUS |
|
![[Bullet]](images/bullet.gif) |
B010C |
Autolab
Electronics
Head Removal For ATL-3 |
|
![[Bullet]](images/bullet.gif) |
B010D |
Autolab
Electronics
Head Removal For ATL-3000 |
|
![[Bullet]](images/bullet.gif) |
B010E |
Autolab
Electronics
Head Removal For ATL-2000 and 2X00 (2200, 2300, 2400,
2500) |
|
![[Bullet]](images/bullet.gif) |
B011 |
How
to Replace the Lithium or Nicad Battery for Memory Back-up in an
Autolab |
10A
(For ATL-1) |
![[Bullet]](images/bullet.gif) |
B012A |
Testing & Replacing Water Bath Float
Switches in
the ATL-2 |
|
![[Bullet]](images/bullet.gif) |
B012B |
Testing & Replacing Water Bath Float
Switches in
the ATL-2 PLUS |
|
![[Bullet]](images/bullet.gif) |
B012C |
Testing & Replacing Water Bath Float
Switches in
the ATL-3 |
|
![[Bullet]](images/bullet.gif) |
B012D |
Testing & Replacing Water Bath Float
Switches in
the ATL-3000 |
|
![[Bullet]](images/bullet.gif) |
B012E |
Testing & Replacing Water Bath Float
Switches in
the ATL-2000 |
|
![[Bullet]](images/bullet.gif) |
B013 |
How
to Access & Replace the Cam With
Magnet |
|
![[Bullet]](images/bullet.gif) |
B014 |
How
to Replace the Air Distributor Gear with
Hose |
|
![[Bullet]](images/bullet.gif) |
B015 |
How
to Replace the Coupler |
|
![[Bullet]](images/bullet.gif) |
B016 |
How
to Replace your Pump Shaft |
6,7,8 & 9 |
![[Bullet]](images/bullet.gif) |
B017 |
Autolab Temperature Temperature Sensor
Calibration
For ATL 2, 2+ and 3 |
|
![[Bullet]](images/bullet.gif) |
B018 |
Nova
Heater Replacement |
|
![[Bullet]](images/bullet.gif) |
B019 |
Rotation
Motor
Upgrade |
9
|
![[Bullet]](images/bullet.gif) |
B020 |
Replacing
Black
Retaining Clips on the JOBO Lift |
|
![[Bullet]](images/bullet.gif) |
B021 |
Conversion
of ATL
1000 to ATL 1500 |
|
![[Bullet]](images/bullet.gif) |
B022 |
Upper
and Lower Head
Removal for ATL-2200 |
|
![[Bullet]](images/bullet.gif) |
B023 |
Upper
and Lower Head
Removal for ATL-2300 |
|
![[Bullet]](images/bullet.gif) |
B024 |
Upper
and Lower Head
Removal for ATL-2400 |
|
![[Bullet]](images/bullet.gif) |
B025 |
Upper
and Lower Head
Removal for ATL-2500 |
|
![[Bullet]](images/bullet.gif) |
B026 |
Battery
Backup
Modification for ATL 2200/2300/2400/2500 |
|
![[Bullet]](images/bullet.gif) |
B028 |
Recirculation
Pump
for ATL 2x00 Processors |
|
![[Bullet]](images/bullet.gif) |
B029 |
EPROM
Replacement
for the the ATL 2X00 |
|
![[Bullet]](images/bullet.gif) |
B030 |
Durst
Equipment
Manufacturing Dates |
|
![[Bullet]](images/bullet.gif) |
B031 |
Spare
Parts
List for Durst Printo Rack |
|
![[Bullet]](images/bullet.gif) |
B032 |
Tecnolab
chain
tightening instructions |
|
![[Bullet]](images/bullet.gif) |
B033 |
Tecnolab
Water
Solenoid Replacement |
|
![[Bullet]](images/bullet.gif) |
B034 |
Opening
the
CPA- 2 and CPP-2 Motor Unit |
|
![[Bullet]](images/bullet.gif) |
B035 |
Devappa
&
Durst Dryer Spare Parts List |
|
![[Bullet]](images/bullet.gif) |
B036 |
Resetting
the
Inspection message in the ATL
2000, 3000, and 2X00 Processors |
|
![[Bullet]](images/bullet.gif) |
B037 |
Chemical
Pumping
Quantity Test in ATL 1,2,2+,3 |
|
![[Bullet]](images/bullet.gif) |
B038 |
Chemical
Pumping
Quantity Test in ATL 2000,3000,2x00 |
|
![[Bullet]](images/bullet.gif) |
B039 |
TecnoLab
Battery
Backup Replacement |
|
Our technical and
repair staff have
compiled a list of frequently asked questions (FAQ's) and the
responses to these questions. Click on FAQ's above to go to a
listing.