JOBO
| E-Mail Formular | Webmaster | Impressum | ©JOBO AG
Service Analog

Instruction Manuals

JOBO

[Bullet]ATL-500 and ATL-800

[Bullet] ATL-1000 and ATL-1500   

[Bullet] ATL-2x00 series  

[Bullet] ColorLine 100

[Bullet] ColorLine 5000

[Bullet] ColorLine 5100

[Bullet] Comparator 100

[Bullet] ComTime

[Bullet] Conversion Tables (Metric and English Measures)

[Bullet] CPE-2 Plus  

[Bullet] CPA-2 and CPP-2  

[Bullet] CPA-2 and CPP-2 Lift

[Bullet] ET-200 Enlarger Timer

[Bullet] Expert Drums

[Bullet] Installing #4167 AutoLab Water Heater Kit

[Bullet] Installing Cogs or Magnets

[Bullet] Loading the #3027 and #3028 Sheet-Film Drums

[Bullet] Loading Tanks, Reels and Drums

[Bullet] PrintLab 3502

[Bullet] PrintLab 3503

[Bullet] PrintLab 3503R

[Bullet] PrintLab 3504

[Bullet] ProTime 100

[Bullet] Specific Processes

[Bullet] Tank and Drum Capacities

[Bullet] Troubleshooting

 
Fujimoto
 
[Bullet] Fujimoto CP51

[Bullet] Fujimoto CP51/P-30 (for Ilfochrome P-30)

Tetenal
 
[Bullet]Ultrafin Liquid Developer Times
[Bullet]Ultrafin Plus Developer Times
[Bullet]Mono C-41 Developing Kit

[Bullet]Mono PK RA-4  Developing Kit
[Bullet]E-6 Three Bath Developing Kit
[Bullet]Instructions for Tetenal Professional PK RA-4
[Bullet]C-41 Press kit
[Bullet]RA-4 10 Liter kit instructons
[Bullet]Tetenal Storage and Date codes
 

Technical Bulletins

# Bulletin Title Related Bulletins
[Bullet] T001 XTOL Development in a Rotary Processing
[Bullet] T002 Kodak EIR Infrared Transparency Film
[Bullet] B001 How to Package your Processor Before Shipping
[Bullet] B002 How to Replace your Pump Motor  5A,5B,6,7,8 & 9
[Bullet] B003 Replacing White Retaining Clips on the JoboLift
[Bullet] B004 Replacing Transfer Gears on Lift Arm == (in JOBO Lifts and AutoLab lift arms that have the four white clips
[Bullet] B005A Removal the Upper head From an ATL-1,2,2+ or 3
[Bullet] B005B Removal the Upper head From an ATL- 2000,3000,2200,2300,2400 and 2500
[Bullet] B006 Removal of the ATL-3, 3000 Lower Motor Unit  5A (ATL-3)
5B (ATL 3000)
[Bullet] B007A Removal of the ATL-2+, 2000 Lower Motor Unit  5A (ATL 2+)
5B (ATL 2000)
[Bullet] B007B Removal of the ATL 2X00's Lower Motor Unit

5B

[Bullet] B008 Removal of the ATL-1 or ATL-2 Lower Motor Unit  5A
[Bullet] B009 Removal of the CPA-2 or CPP-2 Motor Unit
[Bullet] B010A Autolab Electronics Head Removal For ATL-1
[Bullet] B010B Autolab Electronics Head Removal For ATL-2
And 2 PLUS
[Bullet] B010C Autolab Electronics Head Removal For ATL-3
[Bullet] B010D Autolab Electronics Head Removal For ATL-3000
[Bullet] B010E Autolab Electronics Head Removal For ATL-2000 and 2X00 (2200, 2300, 2400, 2500)
[Bullet] B011 How to Replace the Lithium or Nicad Battery for Memory Back-up in an Autolab 10A
(For ATL-1)
[Bullet] B012A Testing & Replacing Water Bath Float Switches in the ATL-2
[Bullet] B012B Testing & Replacing Water Bath Float Switches in the ATL-2 PLUS
[Bullet] B012C Testing & Replacing Water Bath Float Switches in the ATL-3
[Bullet] B012D Testing & Replacing Water Bath Float Switches in the ATL-3000
[Bullet] B012E Testing & Replacing Water Bath Float Switches in the ATL-2000
[Bullet] B013 How to Access & Replace the Cam With Magnet
[Bullet] B014 How to Replace the Air Distributor Gear with Hose
[Bullet] B015 How to Replace the Coupler
[Bullet] B016 How to Replace your Pump Shaft 6,7,8 & 9
[Bullet] B017 Autolab Temperature Temperature Sensor Calibration
For ATL 2, 2+ and 3
[Bullet] B018 Nova Heater Replacement
[Bullet] B019 Rotation Motor Upgrade

9

[Bullet] B020 Replacing Black Retaining Clips on the JOBO Lift
[Bullet] B021 Conversion of ATL 1000 to ATL 1500
[Bullet] B022 Upper and Lower Head Removal for ATL-2200
[Bullet] B023 Upper and Lower Head Removal for ATL-2300
[Bullet] B024 Upper and Lower Head Removal for ATL-2400
[Bullet] B025 Upper and Lower Head Removal for ATL-2500
[Bullet] B026 Battery Backup Modification for ATL 2200/2300/2400/2500
[Bullet] B028 Recirculation Pump for ATL 2x00 Processors
[Bullet] B029 EPROM Replacement for the the ATL 2X00
[Bullet] B030 Durst Equipment Manufacturing Dates
[Bullet] B031 Spare Parts List for Durst Printo Rack
[Bullet] B032 Tecnolab chain tightening instructions
[Bullet] B033 Tecnolab Water Solenoid Replacement
[Bullet] B034 Opening the CPA- 2 and CPP-2 Motor Unit
[Bullet] B035 Devappa & Durst Dryer Spare Parts List
[Bullet] B036 Resetting the Inspection message in the ATL
2000, 3000, and 2X00 Processors
[Bullet] B037 Chemical Pumping Quantity Test in ATL 1,2,2+,3
[Bullet] B038 Chemical Pumping Quantity Test in ATL 2000,3000,2x00
[Bullet] B039 TecnoLab Battery Backup Replacement

FAQ's

Our technical and repair staff have compiled a list of frequently asked questions (FAQ's) and the responses to these questions. Click on FAQ's above to go to a listing.